BP Helios CHP Plant

Project Details

Facebook
Twitter
LinkedIn

This project was the complete replacement of the Combined Heat and Power (CHP) systems in the BP Helios Plaza central plant.  It included the replacement of the gas turbine with a new standby diesel generator system (3.5MW 4160 diesel generator) and the replacement of the absorption chiller with a new electric centrifugal chiller package (2 x 600 ton chillers, 3 x 75 HP chiller water pumps),

RELATED PROJECTS