
Project Details
- Location: Houston, TX
- Architect: Curry Boudreaux Architects
- General Contractor: W.S. Bellows Construction Corp.
- Completion Date: January 2020
- SHARE
Facebook
Twitter
LinkedIn
Phase 2 of the linear accelerator installation at Memorial Hermann Hospital in the Texas Medical Center. This project was the completion of the second vault and the installation of the linear accelerator. Installation of the first vault and linear accelerator were completed in Phase 1 by Melton in 2011.